Difference between revisions of "Speech:Spring 2017 Bonnie Smith Log"

From Openitware
Jump to: navigation, search
(Week Ending February 14, 2017)
(Week Ending February 14, 2017)
Line 57: Line 57:
  
 
2/11 read logs  
 
2/11 read logs  
 +
 +
2/12 real logs and resources.
 +
 +
 +
2/14 ask Jon about the other drones, check on our fob access and continue to check for options in figuring how to unmont the servers.
  
 
;Results:
 
;Results:
Line 64: Line 69:
  
 
2/12 Continued to read the logs. Read a few of the resources that Arron Miller had shared for red hat. I'm still not sure how to disconnect the servers from mnt/main safely I think this is because I still do not fully understand how they are all connected.  
 
2/12 Continued to read the logs. Read a few of the resources that Arron Miller had shared for red hat. I'm still not sure how to disconnect the servers from mnt/main safely I think this is because I still do not fully understand how they are all connected.  
 +
 +
2/14 Jon got back to us and stated that he didn't really work with miraculix just re installed the operating system. He stated that he didn't really do anything post install but we are still having issues connecting to it. Our fobs are still not ready and we still need to work on getting connection to the drones as connection to miraculix directly is difficult
  
  
Line 73: Line 80:
 
2/12 Continue doing research and touch base with the team to see if they have figured out which servers aren't configured properly and if they have had any luck disconnecting the drones.  
 
2/12 Continue doing research and touch base with the team to see if they have figured out which servers aren't configured properly and if they have had any luck disconnecting the drones.  
  
 +
2/14 we responded to Jonas with how we would like to split up the drones once we get them un mounted. Hopefully out Fobs will be ready by tomorrow so we will have access outside of class.
 
   
 
   
 
;Concerns:
 
;Concerns:
Line 78: Line 86:
  
 
2/12 until it is completed I feel that my biggest concern will be safely removing the drones without breaking ceaser.
 
2/12 until it is completed I feel that my biggest concern will be safely removing the drones without breaking ceaser.
 +
 +
2/14 my concerns are ensure that we successfully remove the broken drones and can give the modeling group the server they need. Once this step is done I think that setting up torque will be pretty straight forward.
  
 
==Week Ending February 21, 2017==
 
==Week Ending February 21, 2017==

Revision as of 22:24, 14 February 2017


Week Ending February 7th, 2017

Task

2/2: communicate with group about proposal and plans moving forward.

2/5 forgot to log

2/6 checking in

2/7 read logs


Results

2/2 we decided who is going to organize it and discussed doing a private file share system that would be hosted by Andrew.

2/5 forgot to log

2/6 checking in

2/7 read logs

Plan

2/2 work on the proposal and discuss potential projects for our team.

2/5 forgot to log

2/6 checking in

2/7 read logs


Concerns

2/2 feel kind of lost as to the goal for the semester but the more the team communicates the more it becomes clear.

2/5 forgot to log

2/6 checking in

2/7 read logs

Week Ending February 14, 2017

Task

2/8 Yesterday we got more detail on what needed to be done. We were told to remove the 2 unusable servers use one to test how torque and sphix interact and the other will be going to the tools group to test one of their tools on. We also talk to Jonas about adding IDRAK cards to the servers, this would allow us and further groups to be able to monitor the servers from home and preform different tasks without needing to be in the server room. We also talk to him about using ansible, this is a script that adds all needed programs and configurations to a server. this would be immensely helpful for consistency and it would also allow future groups to quickly rebuild a server if one needed to be used for testing and then put back into the stack

2/11 read logs

2/12 real logs and resources.


2/14 ask Jon about the other drones, check on our fob access and continue to check for options in figuring how to unmont the servers.

Results

2/8 it has become more clear what our goal is we looked at the server rack and tried to figure out how everything was connected. It was very concerning that there is no UPS for the server. Jonas did not approve our request for IDRAKs or the use of ansible both would make our tasks easier and easier for future classes. We got a better idea about how the servers are linked and are looking into how to safely disconnect them from the other servers without causing issues.

2/11 read logs

2/12 Continued to read the logs. Read a few of the resources that Arron Miller had shared for red hat. I'm still not sure how to disconnect the servers from mnt/main safely I think this is because I still do not fully understand how they are all connected.

2/14 Jon got back to us and stated that he didn't really work with miraculix just re installed the operating system. He stated that he didn't really do anything post install but we are still having issues connecting to it. Our fobs are still not ready and we still need to work on getting connection to the drones as connection to miraculix directly is difficult


Plan

2/8 our plan is to talk to Jon Shallow to figure out what he did to which server. We are also researching how to removed the soft link to the server. I wonder however if the servers are already messed up wouldn't they be replicating to the other servers? I may just not fully understand how they are all linked yet. From there I think I will talk to Jonas about getting a UPS for the servers.

2/11 read logs

2/12 Continue doing research and touch base with the team to see if they have figured out which servers aren't configured properly and if they have had any luck disconnecting the drones.

2/14 we responded to Jonas with how we would like to split up the drones once we get them un mounted. Hopefully out Fobs will be ready by tomorrow so we will have access outside of class.

Concerns

2/8 my biggest concern right now is figuring out how to correctly disconnected the link between the other servers without messing the others up. I am also concerned about our lack of availability to the server rooms, hopefully that will be changed shortly.

2/12 until it is completed I feel that my biggest concern will be safely removing the drones without breaking ceaser.

2/14 my concerns are ensure that we successfully remove the broken drones and can give the modeling group the server they need. Once this step is done I think that setting up torque will be pretty straight forward.

Week Ending February 21, 2017

Task


Results


Plan


Concerns


Week Ending February 28, 2017

Task


Results


Plan


Concerns


Week Ending March 7, 2017

Task


Results


Plan


Concerns


Week Ending March 21, 2017

Task


Results


Plan


Concerns


Week Ending March 28, 2017

Task


Results


Plan


Concerns


Week Ending April 4, 2017

Task


Results


Plan


Concerns


Week Ending April 11, 2017

Task


Results


Plan


Concerns


Week Ending April 18, 2017

Task


Results


Plan


Concerns


Week Ending April 25, 2017

Task


Results


Plan


Concerns


Week Ending May 2, 2017

Task


Results


Plan


Concerns


Week Ending May 9, 2017

Task


Results


Plan


Concerns