Weekly Log of Activities - Lastest Week First

Week Ending May 9th - LAST WEEK

Tasks This week

  • Tag Release twice
  • Stage release on STEM
  • Collate tasks list for Teams
  • Project Summary document for Next Semesters Class - Justin
  • Project management - Final Project Meetings set up and project updates

Tasks Completed

  • Tag Release created Thurs
  • Teams tasks lists checked and ensured set up on WIKI
  • Meetings -
  • Tag release created and Staged for testing Sun
  • Tag release created and staged for testing on Tues
  • Email Status report feedback request Sun and Mon
  • Rudementary Testing and recreating Issues logged in Google code

Week Ending May 2nd

Tasks This week

  • Tag Release every other day
  • Collate tasks list for Teams
  • Project Summary document for Next Semesters Class - Justin
  • Project management - Meetings set up and project updates

Tasks Completed

  • Tag Release created Fri Mon and Weds
  • Teams tasks lists checked and ensured set up on WIKI
  • Project Summary Document defered to next week
  • Sykpe meeting with Brian and Cedric Wed pm - Test and Database team tasks.
  • Sykpe meeting with Paskale , Justin, Schulz and Scott - PHP Tasks

Week Ending April 25th

Tasks This week

  • Create Tag Release
  • Put Tag release on Stem
  • Document Prototype staging
    • Detail Stem mysql config
    • apache config
    • RDP access and Path share access.
  • Organize status meeting for Mon 23rd
  • Attend URC on Weds 3:30pm - 6pm
  • Chase FE team for Dbcontrol code
  • Create index.html mock up for STEM - Justin

Tasks Completed

  • Redirect html access file created
  • Redirect html access implemented on STEM
    • Edit to point stem.unh.edu/speak to speak/html
    • Created index.html in index directory
    • Updated SpEAK wiki fromt page to point back to stem.unh.edu/speak
    • Access for testing now stem.unh.edu/speak/php
  • Tag release updated every two days onto STEM
  • Status update request Mon
  • DBcontrol code reviewed
  • Attended URC on 25th
  • Updated Chads email on Google code

Week Ending April 18th

Tasks This week

  • Create Tag Release
  • Put tag release on stem
  • Set up stem mysql database from sql scripts for test team
  • Review Abstract and poster drafts
    • Submit abstract to Ellen
    • Submit poster to melissa for printing
  • Document Prototype staging
    • Detail Stem mysql config
    • apache config
    • RDP access and Path share access.

Tasks Completed

  • Tag release for start of P2 Created HEAD revision 75
  • Tag release staged on STEM
  • Updated database on Stem to reflect database structure changes
  • Finished Poster and Abstract for URC and Submitted
  • Prototype staging document defered to next week

Week Ending APril 11th

Tasks This week

  • Submit abstract for URC by Mon
  • Continue Poster work - screen shots etc
  • Book any required progress meetings
  • Check out codebase and review progress
  • Resolve any issues with SVN

Tasks Completed

  • Abstract not due till Apr 16th so defer till next week
  • Abstract and Poster first hit posted on wiki under documents
  • Codebase checkout and reviewed
  • Prototype staging meeting held with Chris. Hosting of Mysql configuration determined with user rights and RDP confoguration setup.
  • Updated all weekly log tasks lists for the groups


Week Ending April 4th

Task List for Week 1 P1 - Due Apr 4th

  • Installation of Tools Complete and Running
  • Review existing Documentation from previous semester
  • Checkout existing codebase from Google code and review
  • Contact chris re db implementation
  • Poster first hit
  • Abstract reserarch and first hit
  • Update task lists and propose tasks for next week

TASKS COMPLETED

  • Jackie - Installation of Tools complete
  • Jackie - Reviewed Existing documentation complete
  • Jackie - Codebase checked out complete
  • Jackie - Poster first hit completed - sent to Justin for review


Meetings Planned

  • Database team skype Meeting - confirmed 6:00pm Weds 4th
  • Front End team skype Meeting - Skype @ 5:45pm
  • Test team skype Meeting - in class only @ 5:30pm

Week Ending March 28th

Jackies Log Stardate 3/23/12 Reviewed the previous semesters progress and database design documentation. Awaiting confirmation of email addresses and google ids to set up ASANA project team and tasks, and to add the team members to the googlecode repository. Implementation of tools details to be confirmed. Tools Required Google ID - for the googlecode repository and commit privilages ASANA ID - for task management XAMPP - for apache, mysql and php Eclipse PHP - for development management SVN Tortoise - for software configuration management

Jackies Log Stardate 3/25/12 Reviewed previous data structure and set up a mock up database in Access. Primarily to relate the structures in my known environment and to pinpoint any inconsistancies. I am unclear as to the difference between user, team member and author. Is the only difference access privilages?